
Projects
Turn-key projects

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Equipment supply stage.
International Medical Center of Head and Neck Diseases treatment.
2023 - present day.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works.
Reconstruction of an existing building and construction of new building in "Archman" Sanatorium.
2022 - present day.

- Three different Architectural Designs Development;
- Preparation of three different budget options for each Architectural Design;
- Study of cancer treatment solutions available today;
- Preparation of three Equipment lists and Specifications;
- Preparation of three versions of Room-by-Room;
- Nine versions of Preliminary Design;
- Nine versions of Detailed Design.
International Medical Center of Oncology for 500 beds.
2021 - present day.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Obtaining an approval from the Ministry of Construction and Architecture of Turkmenistan;
- Partial “Dräger” equipment supply.
Multiprofile Hospital for 350 beds, Oncology Hospital for 150 beds, Maternity Hospital for 150 beds, Health Center and Emergency Center in Arkadag.
Completed in 2023.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Obtaining an approval from the Ministry of Construction and Architecture of Turkmenistan.
Multiprofile Hospital for 400 beds and Infectious Hospital for 100 beds in Turkmenbashi.
Completed in 2022.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Obtaining an approval from the Ministry of Construction and Architecture of Turkmenistan.
Infectious Hospital for 200 beds in Gokdepe.
Completed in 2021.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Obtaining an approval from the Ministry of Construction and Architecture of Turkmenistan.
Multiprofile Hospital for 450 beds, Oncology Hospital for 150 beds and Infectious hospital for 180 beds in Dashoguz.
Completed in 2021.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Turn-key equipment and 1-year consumables supply, including technical systems replacing (Ventilation, Heating, Air Conditioning Systems, Water supply, Filtration, Medical Gas supply systems), warranty and post-warranty service.
Re-equipment of Diagnostics Center, "Ene Mahri" Center and Nephrology Center of the Directorate of International Medical Centers in Ashgabat.
Completed in 2020.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works.
International Cosmetology Medical Center in Ashgabat. Total area of 17 082.00 m2.
Completed in 2019.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Construction Supervision.
Burn Center for 130 beds in Ashgabat. Total area of 24 626.00 m2.
Completed in 2019.

- Med Concept Europe S.A. acted as subcontractor to "Finasi Medical Equipment Trading LLC" (UAE - Italy)
- Preparation of Equipment list and Specifications;
- Partial Equipment supply, installations, warranty and post-warranty service.
Sheikh Khalifa Ibn Zayed Al Nahyan Children's Hospital for 130 beds in Mary. Total area of 13,103.00 m2.
Completed in 2018.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Construction Supervision;
- Turn-key equipment and 1-year consumables supply, warranty and post-warranty service.
Infectious Hospital for 160 beds in Turkmenabad city. Total area of 11 871.00 m2.
Completed in 2018.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Construction Supervision;
- Turn-key equipment and 1-year consumables supply, warranty and post-warranty service.
Multi-profile Hospital for 676 beds in Turkmenabad city. Total area of 47 652.00 m2.
Completed in 2018.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Construction Supervision;
- Turn-key equipment and 1-year consumables supply, warranty and post-warranty service.
International Endocrinology and Surgery Medical Center for 300 beds in Ashgabat. Total area of 49 095.00 m2.
Completed in 2017.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Construction Supervision;
- Partial equipment supply, warranty and post-warranty service.
International Neurology Medical Center for 120 beds in Ashgabat. Total area of 22 234.00 m2.
Completed in 2016.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Construction Supervision;
- Turn-key equipment and 1-year consumables supply, warranty and post-warranty service.
Scientific Clinical Center for Mother and Child Healthcare for 670 beds in Ashgabat. Total area of 39 150.00 m2.
Completed in 2015.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Construction Supervision;
- Turn-key equipment and 1-year consumables supply, warranty and post-warranty service.
Scientific Clinical Cardiology Center for 350 beds in Ashgabat. Total area of 18 189.00 m2.
Completed in 2014.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Construction Supervision;
- Turn-key equipment supply, warranty and post-warranty service.
Sanatorium in Farap city, Mary region.
Completed in 2010.

- Preparation of Equipment list and Specifications;
- Preparation of Room-by-Room;
- Preliminary Design works;
- Detailed Design works;
- Construction Supervision;
- Turn-key equipment supply, warranty and post-warranty service.
Sanatorium in Bayramali city, Mary region.
Completed in 2009.
- Multiprofile City Hospital, Dovletli county, Lebap region, 2009
- Multiprofile City Hospital, Altyn Sahra county, Mary region, 2009
- Polyclinics, Ashgabat city, 2010 (project preparation without equipment supply)
- Multiprofile City Hospital, Abadan city, Ahal region, 2010
- Medical Center at the Military Base of Special Purpose Entities, Ashgabat city, 2013
- Medical Center at “Hasyl” Hotel, Turkmenbashi city, Balkan region, 2013
- Medical Center at the Naval Base of Navy Forces, Turkmenbashi District (Janga), Balkan Region, 2013
- Medical Center at the Military Institute, Ashgabat city, 2014
- Medical Center at the Military Maritime Institute of TNU, Turkmenbashi city, Balkan Region, 2015
- Medical Center at the International Seaport, Turkmenbashi city, Balkan Region, 2018
- Multiprofile City Hospital, Serdar city, Balkan Region, 2009
- Multiprofile City Hospital, Esenguly city, Balkan Region, 2009
- International Medical Center of Mother and Child “Ene Mahri”, Ashgabat city, and in 4 regions of Turkmenistan (Balkan, Lebap, Mary, Dashoguz), 2009
- International Medical Center of “Head and Neck” at the Direction of International Medical Centers, Ashgabat city, 2009
- Oncology Center, Ashgabat city, 2009
- Multiprofile City Hospital, Gokdepe city, Ahal region, 2009
- Multiprofile City Hospital, Ruhybelent village, Dashoguz region, 2009
- Multiprofile City Hospital, Ahal region, 2009
- Emergency Care Centers, Ashgabat city, and in 4 regions of Turkmenistan (Balkan, Lebap, Mary, Dashoguz), 2015
- Direct deliveries of medical equipment to hospitals and clinics of the Ministry of Health and Medical Industry of Turkmenistan since 2007
- House of Health for 30 beds with an ambulance station and a pharmacy, Babarap city, Ruhabad region, Ahal region, 2010
- Rehabilitation Center, Balkan region, 2011
- Regional Multiprofile Hospital for 250 beds, Mary city, Mary region, 2012
- New building of the “Dashoguz” Sanatorium for 200 beds, Gurbansoltan-Eje, Dashoguz region, 2013
- Boarding school for 420 beds with Health Center, Ashgabat city, 2013
- Multiprofile Hospital in for 516 beds, Mary region, 2013
- Rehabilitation Center for 120 beds, Tejen city, Ahal region, 2014
- Medical Unit for 35 beds at the Military Unit of the State Border Service of Turkmenistan, Tagtabazar city, Mary region, 2014
- Sanitary and Epidemiological Station, Ashgabat city, 2014
- Infectious Disease Center, Ashgabat city, 2014
- Reconstruction of the Dental Center, Ashgabat city, 2015
- House of Health, Ashgabat city, 2015
- Morphology Center, Ashgabat city, 2015
- Medical Center at the Embassy of the Russian Federation, Ashgabat city, 2015
- Mobile Hospital for 50 beds at the Ministry of Defense of Turkmenistan, Ashgabat city, 2015
- Equipment selection for helicopters of Sanitary Aviation of Turkmenistan, Ashgabat city, 2015
- Regional Center of Mother and Child Healthcare, Balkan region, 2016
- House of Health in Keshi area, Ashgabat city, 2016
- House of Health, Belek city, Balkan region, 2016
- Multiprofile Hospital in Mary city, Mary region, 2016
- Multiprofile Hospital for 50 beds with Maternity House and House of Health for 30 beds in Magtumguly village, Balkan region, 2016
- Sanatorium “Ak Bugday” for 200 beds, Ahal region, 2017
- House of Health “Awaza”, Balkan region, 2017
- Maternity Department Building for 20 beds, Dushak village, Kaahka region, Ahal region, 2018
- Treatment and Preventive Care Center, Ashgabat city, 2019